Since 1990, 175 thousand people have moved to Des Moines, Iowa, increasing its population by 40%. As Des Moines Water Works’ distribution system grew to accommodate these new residents, so did its need for more accurate data, better asset visibility, and increased reliability.

Download the case study to learn how Des Moines improved their operations:

  • Mean time between failure on Des Moines’ pumps and motors improved by 37%.
  • Maintenance overtime is down; reliability and availability of critical equipment is up.
  • Wire-to-water efficiency improved by 14.1%
  • Improved energy spend by more than $220,000.